Return
Email
Pre-Bent S Curve MonoRail
pre-bent_s_curve_mo_156.jpg

Pre-Bent S Curve MonoRail by Visual Comfort & Co. Architectural Collection

$
325
99
/ 1
  • Part Number: 700MOBHSC60BRZ
  • UPC: 00756460993795
  • Availability: Item is usually in stock with manufacturer, but we'll be in touch if there's a problem
Quantity:
Add To Cart
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (2)
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B

Specifications
Details
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze /vendors/vendorImages bronze.jpg
Style:
Contemporary
Option:
Title 20
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
Manufactured By:
Visual Comfort & Co. Architectural Collection
To: From: Subject:

Shallotte Electric

The Shallotte Electric Stores were founded by Alton and Edna (E.B.) Milliken along with two of their teenage sons Al and Jamie. They rented a red and white grocery store building in June of 1971. The family stocked shelves and in some cases used empty boxes to give the appearance of a large inventory. Their timing in starting the business was good as the Brunswick County beaches became more and more popular. As Brunswick County Grew so did the business.

Contact Us

Shallotte Electric Showroom
4900 Main St,
Shallotte, NC 28470


Southport Showroom
4871 Southport-Supply Rd SE
Southport, NC 28461

Showroom Hours

Shallotte - M-F: 8AM - 5PM
Southport - M-F: 9AM - 4:30PM
Sat & Sun: Closed
Copyright 2025 Shallotte Electric. ALL Rights Reserved.